SIEMENS Combustion Controller LME22.331C2BT Flame Detector Stock 20
$800
Shipping
$ 50
to
United States
Via
Fedex IP
Delivery
Estimated: 3-7 Days
$800
$0.00
Add to Inquiry List
SIEMENS Combustion Controller LME22.331C2BT Flame Detector Stock 20
SKU: 211528 $0Description
Q&A
Reviews
Product Description
Company Profile
The main brands sold by our company are: Honeywell, Kromschroder, Fireye, MAXITROL, SIEMENS, OMRON, Durag, DUNGS, Elektrogas, Azbil, COFI, MADAS, Fujifilm, Eurotherm, WEST, LAM TEC, Fisher Main products are :DCS, SIS system, transmitter (temperature transmitter, pressure transmitter, differential pressure transmitter), temperature control instrument, carbon control meter, combustion safety products: flame detector, flame controller, solenoid valve, pressure switch, actuator, transformer Our company mainly engaged in Honeywell DCS and SIS system.Honeywell transmitter. Honeywell, Omron, Fuji temperature control instrument.combustion safety control products: Honeywell, Kromschroder, Siemens, Fireye, Maxitrol.adequate inventory, original auth
Payment&Logistics
FAQ
1. When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.
2.How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.
3.How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.
You can use your own express account or prepay us if you do not have an account.
4. How long does the whole procedure being worked out?
After you place a order,the production handling time is about 45-60 days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.
5.What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
6.What is your term of delivery?
We accept EXW, FOB Shenzhen or FOB Guangzhou. You can choose the one which is the most convenient or cost effective for you.
7.What about the lead time for the mass production?
Honestly, it depends on the order quantity and the season you place the order.
8.Can we print our logo/website/company name on products?
Yes, please advise the size and Pantone Code of the logo.
9.What's the lead time for regular order?
14-21 days for order quantity lower than 5000pc; For more quantity, usually 30 days.
10.Do you inspect the finished products?
Yes, each step of production and finished products will be came out inspection by QC department before shipping.
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.
2.How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.
3.How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.
You can use your own express account or prepay us if you do not have an account.
4. How long does the whole procedure being worked out?
After you place a order,the production handling time is about 45-60 days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.
5.What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
6.What is your term of delivery?
We accept EXW, FOB Shenzhen or FOB Guangzhou. You can choose the one which is the most convenient or cost effective for you.
7.What about the lead time for the mass production?
Honestly, it depends on the order quantity and the season you place the order.
8.Can we print our logo/website/company name on products?
Yes, please advise the size and Pantone Code of the logo.
9.What's the lead time for regular order?
14-21 days for order quantity lower than 5000pc; For more quantity, usually 30 days.
10.Do you inspect the finished products?
Yes, each step of production and finished products will be came out inspection by QC department before shipping.
No data
0.0
Based on 0 reviews
0 comments, 0 with images
Write a Review
Max 1000 characters
Customer Reviews (0)
You May Also Like
Germany Temperature Control Meter Controller RWF50.20A9 Industrial Control Original Packaging STOCK
$800
Siemens AZL52.00B1 Operation Panel Control Unit operation panel controller for the low-nitrogen burner Original and Brand New
$800
German Siemens Industrial Control Dedicated Controller with Modbus Communication and 220V LGB22.330A27 in Stock MOQ1
$800
LFL1.333 LAL2.25 LFL1.333RL LAL1.25 Combustion Safety Controller Boiler Parts for SIEMENS STOCK
$800
Germany Siemens Industrial Control PLC Module VGG10.404P Spot 20 with Modbus Interface 220V Original Packaging
$800
Collected in wish list
SIEMENS Combustion Controller LME22.331C2BT Flame Detector Stock 20
SKU: 211528 $800Add to Inquiry List
SIEMENS Combustion Controller LME22.331C2BT Flame Detector Stock 20
SKU: 211528 $0